Call Us: 954-371-1370 Email: info@powerfenceinc.com 902 SW 2nd Place, Pompano Beach, FL 33069
Licensed & Insured - Broward Lic. 20-F-21831-X
Palm Beach Lic. U-22529

Davie · Broward County

Davie
Fence Company

From canal-front lots and coastal high-hazard properties to CRA downtown blocks, pool enclosures, custom gates and fence replacements — Power Fence helps Davie property owners navigate the process from estimate to final inspection.

20+ yrsServing South Florida
500+Five-star reviews
Licensed & InsuredBroward + Palm Beach

Before you install

What homeowners should know before installing a fence in Davie.

Davie is Broward's oldest city, and its fence rules read that way — a base code that applies city-wide, a downtown CRA overlay with its own design standards, a coastal high-hazard flood layer across much of the east side, and a separate height rule for the first ten feet along a waterway. Here's how those layers actually stack, in plain English, with the measurements that matter: how tall, how close, what changes on the water, what changes at a corner, and what a pool barrier has to do.

01

How tall, and where

On a typical Davie single-family lot, the front yard is capped well below the side and rear. RS and RD districts — and every single-family, two-family and townhouse lot regardless of district — hold the front yard to four feet.

Most Davie homes cannot have a privacy fence in the front yard.
  • Front yard · RS / RD / CRA — 4′ maximum
  • Front yard · single/two-family/townhouse — 4′ maximum in any district
  • Side yard — 6′ maximum
  • Rear yard — 6′ maximum
  • Corner street side & through-lot rear — 6′ maximum
Fig. 01 — Residential lot, top-down view
02

Height is measured from the higher grade

Fence height is measured from the grade the fence is erected on — and where the two sides sit at different elevations, the higher elevation controls. It's the rule that quietly decides how tall your fence can actually be on a filled or bermed lot.

A 6′ fence measured from a raised yard can read as a non-compliant 7′ fence on the neighbor's side.
  • Baseline — the higher of the two grades
  • Side / rear ceiling — 6′ from that baseline
  • Fill, berms and raised patios reduce your usable height
Fig. 02 — Grade difference, elevation view
03

The 10-foot waterway step-down

If the lot fronts a canal or waterway, a separate rule replaces the standard ceiling inside the first ten feet of water — measured from the seawall or top of bank. Solid fencing steps down; open fencing does not.

A solid 6′ fence at the seawall is the single most common canal-front redesign we make.
  • Opaque, within 10′ of the water — 5′ maximum
  • Non-opaque, within 10′ — 6′ maximum
  • Past 10′ inland — standard 6′ rule resumes
Fig. 03 — Canal-front section
04

The 30-foot sight triangle

At every street intersection, two 30-foot legs run along the abutting street lines and close into a triangle. Inside it, nothing may obstruct the view between 30 inches and 8 feet above grade — the band a driver actually looks through.

Corner lots have fewer usable fence lines than interior lots — the triangle comes off the top.
  • Triangle legs — 30′ along each street line
  • Clear window — 30″ to 8′ above grade
  • Fix it by staying outside the triangle, or dropping to 30″ inside it
Fig. 04 — Corner sight triangle, top-down view
05

Where the fence line actually lands

Three small numbers catch Davie homeowners off guard, and all three are measured to the outer edge — footers included. Fences are permitted only inside lot boundaries; nothing may sit in a right-of-way.

Build to the line, not on it — and the footer counts as part of the fence.
  • 1″ minimum — clearance from any property or street line
  • 2½′ setback — from a property line abutting a platted alley
  • Water meter — must stay accessible to the reader
  • Sunshine 811 — 2 full business days before digging
Fig. 05 — Edge clearances, plan detail
06

Coastal high-hazard & flood areas

Across much of eastern Davie, flood-damage prevention standards govern solid, privacy and debris-trapping fences. The fence has to stand on its own — outside the building footprint, unattached to the house, and engineered either to let floodwaters pass or to fail under them.

In the V-zone, open-pattern aluminum usually clears the engineering bar a solid fence can't.
  • Outside the building footprint
  • Not structurally attached to the structure
  • Designed to avoid obstructing floodwaters, or to fail
  • The HB 803 permit exemption does not apply in flood hazard areas
Fig. 06 — Coastal high-hazard fence, elevation view
07

Pool barrier requirements

Pool barriers are a life-safety item, and inspectors check the details closely — height, the gap between pickets, latch height and which way the gate swings. Davie adds one more: gates must be kept latched when the pool isn't in use.

Pool barrier inspections focus on details many homeowners never think about.
  • Minimum fence height — 48″
  • Latch height — 54″ above grade
  • Maximum opening — 4″ (no 4″ sphere passes)
  • Gate — self-closing, self-latching, swings away from the pool
Fig. 07 — Pool barrier & gate, elevation view

The short version

Davie fence rules, at a glance.

The numbers we plan around on every Davie project. Every site is different — these are the typical starting points.

4′Front yard
RS / RD / CRA
6′Side yard
fence
6′Rear yard
fence
6′Corner street side
& through-lot rear
5′Opaque within
10′ of water
6′Non-opaque within
10′ of water
30′Sight triangle
legs
30″–8′Clear visibility
window
1″Outer-edge
clearance
2.5′Platted alley
setback
48″Pool
barrier
54″Pool gate
latch
Higher GradeHeight is measured from the higher of the two grades on either side of the fence
Faces OutFinished, decorative side must face the exterior or public side
Permit RequiredEven a same-for-same replacement of an existing fence needs a permit here
Not AllowedLouvered concrete city-wide; barbed, electrified & razor wire in residential and CRA districts

After you sign

What happens next.

From your first estimate to final inspection, every step has a real person attached to it — and we tell you exactly where your project is.

  1. 01 · Estimate & Site Visit

    We visit the property, discuss goals, measure the area and check for CRA, coastal high-hazard, waterway or historic conditions.

  2. 02 · Survey & Documentation

    We review the survey, property lines, alleys, easements, seawall edges and proposed fence layout.

  3. 03 · HOA & Permit Coordination

    Nikki runs the application through the Davie Building Division, Planning & Zoning and your HOA so you never deal with the city directly.

  4. 04 · Approval Complete

    Permits in hand, any Certificate of Appropriateness issued, HOA letter on file, materials ordered and install date scheduled.

  5. 05 · Installation

    Our own crews install — never unlicensed subs. Site is cleaned daily.

  6. 06 · Final Inspection

    We meet the city inspector on-site and close the permit. You get the final paperwork.

  7. 07 · Warranty & Support

    Manufacturer warranties on materials, our own workmanship guarantee and a real number to call.

Nikki, Permit Coordinator

Meet your project liaison

Nikki

HOA & Permit Coordinator

Nikki runs the back-of-house side of every Davie project — submitting plans to the city, tracking CRA and historic review where it applies, working with HOAs on color and material approvals, coordinating surveys and easement documentation, and scheduling inspections. She's the one keeping your project moving while our crews and you focus on the install itself. If you ever wonder where things stand, she's the person to call.

The bigger picture

Six rule sets on one small map.

Davie packs more regulatory variety into six square miles than cities three times its size. A downtown CRA block, a 1920s platted lot with an alley behind it, a canal-front home on the Intracoastal and a beachside property in the coastal high-hazard area are four genuinely different fence projects — even with identical fences. Planning here starts with figuring out which layers land on your parcel, not with picking a material.

  • CRA form-based district design standards
  • Coastal high-hazard & flood-zone engineering
  • 10′ waterway step-down along canals
  • Older platted blocks, alleys & tight setbacks
  • Historic landmark Certificates of Appropriateness
  • Native tree root protection at every posthole

Different parts of town, different plans

Davie is not one market.

Five areas we work in most often. Each carries its own conditions — coastal exposure, canal frontage, CRA design review, older platted blocks — that shape the plan well before we talk materials.

East · Coastal

The Beach District

  • Coastal high-hazard conditions
  • Salt-air exposure planning
  • Free-standing fence engineering
East · Waterfront

Sun Garden Isles

  • Canal-front lots
  • 10′ waterway step-down
  • Open-pattern fence planning
Central · Established

Davie Heights

  • Older platted blocks
  • Alley setbacks
  • Fence replacements
West · Family

Meli-Mar

  • Backyard improvements
  • Pool-barrier projects
  • Privacy fencing
Downtown · CRA

The CRA Corridor

  • Form-based design standards
  • Decorative 4′ front fencing
  • Cedar or heavy timber, capped

Davie project spotlights

Recent jobs.

A representative cross-section of the work we do in Davie — each one with its own constraints, its own approvals, its own outcome.

Shadowbox Wood
01 - Shadowbox Wood project

Shadowbox Sherrilyn

Project

A shadowbox fence project shaped around privacy, airflow and a cleaner backyard boundary.

Case Study ->
Aluminum
02 - Aluminum project

Aluminum Upgrade

Project

A black aluminum upgrade selected for open visibility, durability and a more finished perimeter.

Case Study ->

Fence solutions for Davie

Every material we install.

No "preferred" Davie fence material here — the right answer depends on which overlays hit the parcel, salt and coastal exposure, CRA design standards, pool-barrier needs, privacy goals, maintenance expectations and budget. We talk through every option and recommend what fits the property.

01

Vinyl Fencing

Explore
02

Aluminum Fencing

Explore
03

Wood Fencing

Explore
04

Chain Link Fencing

Explore
05

Composite Fencing

Explore
06

Gates & Automation

Explore
07

Commercial Fencing

Explore
More

Not sure which?

Get a free estimate

Permits & approvals

We help navigate the process.

Surveys, site plans, permit coordination, CRA and historic review, easement documentation, HOA approvals, product approvals and inspections — handled end to end. You're on the project, not the paperwork.

Nikki, Permit Coordinator

Coordinator

Nikki handles every Davie permit submission and HOA package end to end.

  1. 01

    Property surveys

    The city's fence checklist requires a survey showing the area to be fenced, with length and height noted. If you don't have a current one, we coordinate it.

  2. 02

    Site plans

    Drawn to scale — fence location, height, material, gates, alley setbacks and seawall edges where they apply.

  3. 03

    Permit coordination

    We submit to the Davie Building Division, respond to comments and chase approvals. Even a same-for-same replacement needs a permit here.

  4. 04

    Wood fence documentation

    Wood installs go in with the city's wood fence information sheet and Florida Building Code wind-load detailing attached.

  5. 05

    Product approvals

    For non-wood materials, Florida Product Approval / NOA numbers or engineered drawings, assembled for the packet.

  6. 06

    CRA & historic review

    Form-based district design review where the parcel sits in the CRA, and a Certificate of Appropriateness before any work on a designated landmark.

  7. 07

    HOA approvals

    Architectural-review packages with color, material and elevation samples your board can sign off on.

  8. 08

    Inspection & closeout

    We meet the inspector on-site, walk the install, close out the permit and send you the final paperwork.

Good to know

Davie fence questions.

Straight answers to what Davie homeowners ask us before every project. Still wondering something? Just call — we're happy to talk it through.

How tall can a fence be in Davie?

Side and rear yards are capped at 6′ in residential and CRA districts. Front yards in RS, RD and CRA districts — and on any single-family, two-family or townhouse lot — are capped at 4′. Corner street-side yards and through-lot rears follow the 6′ side/rear rule.

Can I put a privacy fence in my front yard?

On most Davie homes, no. The 4′ front-yard limit applies to single-family, two-family and townhouse lots in every district, and inside the CRA the front fence also has to be one of five decorative types.

How is height measured if my yard is higher than my neighbor's?

From the higher elevation. The city measures from the grade the fence is erected on, and where the two sides differ, the higher one controls — so filling or berming your side reduces the height you can build.

I'm on a canal. Can I run a 6′ solid fence along the seawall?

Not a solid one. Within 10′ of the seawall or top of bank, opaque fences cap at 5′ and non-opaque fences at 6′. Past that 10′ strip, the standard 6′ rule resumes — so we often transition materials at the line.

What is the 30-foot sight triangle?

At an intersection, two 30′ legs run along the abutting street lines and close into a triangle. Inside it, nothing may block visibility between 30″ and 8′ above grade. A solid 6′ fence inside the triangle doesn't comply.

My lot is in the coastal high-hazard area. Can I still fence it?

Yes, with engineering. The fence has to sit outside the building footprint, stay structurally unattached to the house, and be designed either to avoid obstructing floodwaters or to fail under them. Open-pattern aluminum is the usual answer.

How close to the property line can the fence go?

No closer than 1″ — and that's measured to the outer edge, footers included. If the lot abuts a platted alley, the setback from that line is 2.5′. Nothing may sit in a right-of-way.

I'm replacing a damaged fence with the same kind. Do I still need a permit?

Yes. Davie's fence FAQ is explicit that replacing or repairing a fence with the same fence still requires a permit — there's no same-for-same exemption in the local code.

What about the big tree in my back yard?

Native trees are protected, and the rules require postholes and trenches to be adjusted around major roots rather than cut through them. Continuous masonry footers have to stop at larger roots and bridge over them, so expect some post-spacing irregularity.

Are there materials I can't use?

Louvered concrete is prohibited city-wide. Barbed, electrified and razor wire are banned in residential and CRA districts and along abutting property lines. The finished, decorative side of the fence must face the exterior or public side.

My house is a designated historic landmark. What changes?

A Certificate of Appropriateness has to be issued before any exterior alteration or new construction — including a new fence. It's in addition to the building permit, not instead of it, so historic review goes first.

How long does permitting take?

It varies with the city's review queue, whether CRA or historic review applies, HOA windows and whether revisions are needed. Nikki gives you a realistic window up front and keeps you posted at each step rather than promising a date we can't hit.

Have a question we didn't cover?

Ready when you are

Work with a fence company
that understands Davie.

Whether you're replacing an aging fence, planning around a canal or the coastal high-hazard line, working inside the CRA, or navigating permitting requirements — Power Fence can guide the process from estimate to final inspection.

Financing available

Fence now. Pay over time.

Power Fence can help customers explore monthly payment options through Wisetack for eligible fence, gate, and railing projects.

UP TO 25K ELIGIBLE PROJECTS Fast customer prequal No prepayment penalty

Ask about financing

Financing subject to credit approval. Payment options are provided by Wisetack lending partners.