Call Us: 954-371-1370 Email: info@powerfenceinc.com 902 SW 2nd Place, Pompano Beach, FL 33069
Licensed & Insured - Broward Lic. 20-F-21831-X
Palm Beach Lic. U-22529

Sea Ranch Lakes · Broward County

Sea Ranch Lakes
Fence Company

From waterfront properties and intracoastal homes to privacy fencing, pool barriers, and custom gates, understanding how views, setbacks, and fence placement interact is often the most important part of a Sea Ranch Lakes fence project.

500+Five-star reviews
20+ yrsServing South Florida
Licensed & InsuredBroward + Palm Beach

Start at the water

A village designed around water, views, and privacy.

Most South Florida fence conversations begin with height and material. In Sea Ranch Lakes they begin with position. The water edge, the street edge and the ground between them each carry their own expectations, and a single waterfront lot can move through three of them in forty feet. The map below is how we read a property before a line is drawn.

Fig. 01 — Sea Ranch Lakes waterfront planning map INTRACOASTAL WATERWAY MEAN WATER LINE SUBJECT PROPERTY · PROPERTY LINES PER SURVEY 15-FOOT WATERFRONT ZONE FENCE AND HEDGE LIMITED TO 3 FEET 15′ FENCE PERMITTED TO 6 FEET · HEDGE TO 8 FEET RESIDENCE STREET STREET EDGE · RIGHT-OF-WAY 5 FEET FROM STREET · NO FENCE 15 FEET FROM STREET · NOTHING OVER 3 FEET 3-FT FENCE AT THE WATER 6-FT FENCE BEHIND THE WATERFRONT ZONE LOW HEDGE INSIDE THE STREET ZONE 01 02 03 04 05 06

Tap the diagram to enlarge · then drag to explore

01

Waterfront restrictions

The band closest to the intracoastal is measured from the mean water line, not from the seawall cap or the edge of the lawn. Inside it, fence and hedge are both held low.

02

The transition line

Fifteen feet in from the water, the allowance changes. A run that starts at three feet can step up as it moves inland, and that step is drawn on the plan.

03

View preservation

The low band exists so the waterway still reads as open from the homes and the street behind it. Neighboring views are part of what the review protects.

04

Street visibility zone

Within fifteen feet of the street, nothing over three feet — fence, wall or hedge. It keeps driveways, corners and sidewalks legible from a car.

05

Street edge

The first five feet from the street carry no fence at all. The property line is usually well inside the pavement edge, so this is measured, never estimated.

06

Privacy considerations

Full-height privacy belongs to the middle of the lot — between the waterfront zone and the street zone, where the house itself already does most of the screening.

The location of a fence often matters as much as the fence itself.

Section 03

Understanding the 15-foot waterfront zone.

Sea Ranch Lakes limits fence and hedge heights closest to the water in order to preserve waterfront character and visibility. The measurement starts at the mean water line and runs inland fifteen feet. Everything inside that band — fence, wall, hedge, planter — is held to three feet.

Fig. 02 — Section through the waterfront zone WATER MEAN WATER LINE SEAWALL 15-FOOT WATERFRONT ZONE 15′ GRADE 3′ MAX FENCE HEIGHT 3′ MAX HEDGE HEIGHT LANDSCAPE AREA · ALLOWANCE STEPS UP HOME TRANSITION THE FIRST FIFTEEN FEET SET THE CHARACTER OF THE WHOLE WATERFRONT

Tap the diagram to enlarge · then drag to explore

3 feet

Maximum fence height

Inside the waterfront zone the fence is a boundary marker rather than a screen. Open pickets and rails read better at that height than solid panels.

3 feet

Maximum hedge height

Planting is measured the same way a fence is. A hedge allowed to grow past three feet in the zone becomes the same issue as an over-height fence.

Measured from

The mean water line

Not the seawall cap, not the dock, not the lawn edge. The survey establishes the line the fifteen feet is taken from.

Why

Waterfront character

The band keeps the waterway visually continuous from property to property, which is much of what makes the village read the way it does.

The fence design that works elsewhere on the property may not be permitted near the water.

Section 04

The Sea Ranch Lakes height map.

A waterfront lot is not governed by one height. It is governed by three, and they change as you move away from the water. Drawing those zones before the fence line is what keeps a project from being redesigned at review.

Fig. 03 — Height allowance by zone WATER ZONE 1 · 0–15 FT FROM WATER ZONE 2 · 15 FT TO BUILDING SETBACK ZONE 3 · REMAINING PROPERTY 3′ 6′ 8′ HEDGE 6′ FENCE 3′ FENCE 6′ · HEDGE 8′ FENCE 6′ · HEDGE 8′

Tap the diagram to enlarge · then drag to explore

Zone 1

0–15 feet from water

Fence max
3 feet

The waterfront band. Fence and hedge are both held at three feet so the water edge stays visually open along the whole shoreline.

Zone 2

15 feet from water to building setback

Fence max
6 feet
Hedge max
8 feet

The working part of a waterfront yard. Privacy fencing, pool enclosures and side-yard runs generally live here.

Zone 3

Remaining property

Fence max
6 feet
Hedge max
8 feet

Away from the water the allowance holds steady — until the street zone takes over near the front of the lot.

Fence height restrictions change depending on location within the property.

Section 05

Waterfront privacy versus waterfront views.

Every waterfront homeowner is solving the same two problems at once: being seen less, and seeing more. Pushed to either extreme the result disappoints. Successful waterfront projects often balance privacy and openness rather than maximizing one at the expense of the other.

Option A

AMaximum privacy

SIGHT LINE STOPS SOLID SCREEN · NO WATER VIEW FROM THE YARD
  • Highest screening from neighbors and passing boats
  • Water view is lost from seated height in the yard
  • Not permitted inside the waterfront zone at this height
Option B

BOpen visibility

VIEW PRESERVED 3-FT OPEN PICKET · BOUNDARY WITHOUT A WALL
  • Water views held from the terrace and the house
  • Defines the property line and contains pets and children
  • Little screening from adjacent lots or the waterway
Option C

CLayered landscaping

OPEN AHEAD PLANTING SCREENS THE SIDES · WATER STAYS OPEN
  • Screening placed where neighbors are, not across the view
  • Fence stays within the waterfront height allowance
  • Planting softens the boundary and matures into the design
Sight lines

Sit down and look

Views are judged from where people actually are — a terrace chair, a kitchen window — not standing at the seawall. That is what decides how much a three-foot run really costs you.

Direction

Privacy is directional

Most exposure on a waterfront lot comes from the sides, not from the water. Screening the flanks and leaving the center open solves both problems at once.

Layering

Fence plus planting

A low fence handles the boundary; planting handles the screening. Together they satisfy the height rules and still deliver privacy.

The best waterfront fence designs often work with the property rather than against it.

Section 06

Street-side visibility requirements.

At the front of the property a second set of measurements takes over. No fence within five feet of the street, and nothing over three feet within fifteen. These requirements help preserve visibility and neighborhood continuity along streets that are narrow, quiet and heavily walked.

Fig. 04 — Street edge, in plan STREET SIDE STREET · CORNER LOT STREET EDGE 5-FOOT NO FENCE ZONE 5′ 15-FOOT VISIBILITY ZONE · NOTHING OVER 3 FEET 15′ CORNER · BOTH FRONTAGES APPLY FULL-HEIGHT FENCE PERMITTED BEHIND THE VISIBILITY ZONE HOME 6-FT FENCE HELD BEHIND THE 15-FOOT LINE 3-FT MAXIMUM IN THE VISIBILITY ZONE DRIVEWAY A corner lot has two street frontages — both zones are measured, not just the front one.

Tap the diagram to enlarge · then drag to explore

5 feet

No fence at all

The first five feet in from the street stay clear. This is measured from the property line, which usually sits well behind the pavement edge.

15 feet

Nothing over three feet

Between five and fifteen feet a low fence or low planting is fine. Full-height runs begin behind that line.

Corner lots

Two frontages

A corner property carries the same measurements on both streets, which can turn what feels like a side yard into a second front.

Continuity

The street reads as one

Held together, these setbacks are why the streets stay open and green rather than becoming a corridor of walls.

Street-facing fence placement often involves different rules than backyard fencing.

Section 07

A fence along the intracoastal is not the same as a fence in a backyard.

An interior lot fence answers to the property it encloses. A waterfront fence is read from the water, from the neighboring homes, and from the street behind it — and it is exposed to salt air and wind loads that inland fencing never sees. That changes how it is planned, specified and detailed.

Water views

The asset being protected

On a waterfront lot the view is a large share of what the property is. Anything built between the house and the water is measured against that.

Character

Read from three sides

The fence is seen from the waterway, from adjacent lots and from the street. There is no back side of a waterfront fence.

Sight lines

Yours and the neighbors'

A run that opens your view can close someone else's. Waterfront review considers the shoreline as a continuous edge.

Property value

Openness carries weight

Buyers of waterfront homes pay for the relationship to the water. A design that walls it off works against the property.

Exposure

Salt, wind, and sun

Coastal exposure rules out some materials and hardware outright. Fastener and finish selection matters more here than anywhere else we build.

Integration

Built into the architecture

Seawall caps, docks, terraces and pool decks all meet the fence line. The detailing is coordination work, not catalog work.

Waterfront fencing requires a different planning approach.

Section 08

The good side faces out.

Sea Ranch Lakes generally requires the finished side to face outward — toward the neighbor or the street, with posts and rails turned into your own yard. There is a recognized exception where a significant obstacle already exists on the adjacent property, and it is worth knowing before layout rather than after.

Fig. 05 — Correct installation

✓Finished side facing out

PLAN · LOOKING DOWN NEIGHBOR OR STREET · SMOOTH FACE YOUR YARD · POSTS AND RAILS INWARD ELEVATION · FROM THE PUBLIC SIDE CONTINUOUS FINISHED FACE · NO VISIBLE FRAMING
  • Finished side faces the neighboring property or the street
  • Posts and rails turn inward, toward your own yard
  • Orientation is shown on the plan and confirmed on site
Fig. 06 — Special waterfront exception

!Approved alternate orientation

CONDITION A · EXISTING HEDGE ON ADJACENT PROPERTY POSTS TURNED TOWARD THE HEDGE · FACE READS TO YOUR YARD CONDITION B · EXISTING FENCE ON ADJACENT PROPERTY EXISTING NEIGHBOR FENCE NEW FENCE SET AGAINST IT · ALTERNATE POST ORIENTATION THE EXCEPTION IS REVIEWED CASE BY CASE, IN ADVANCE
  • Applies where a hedge or fence already stands on the adjacent property
  • The obstacle has to be significant, existing and documented
  • Approval is obtained during review, not assumed at installation
Default

Finished side outward

Unless an exception is granted, the smooth face belongs to the neighbor or the street. On a corner lot that can mean two public faces.

Exception

Significant obstacle

Where an existing hedge or fence sits tight against the line, turning the finished face outward can be impractical — and an alternate orientation may be approved.

Appearance

Reviewed, not assumed

Orientation is part of both the appearance standard and the code review. It is noted on the submittal before anything is built.

Cost

Cheap now, expensive later

Correcting orientation after installation usually means re-hanging every panel on the run. It is a five-minute decision at layout.

Fence orientation is reviewed as part of both appearance and code compliance.

The short version

Sea Ranch Lakes fence rules, at a glance.

The measurements we plan around on every Sea Ranch Lakes project. Every property is different — these are the typical starting points, confirmed against your survey during the estimate.

15′Waterfront zone
from mean water line
3′Fence and hedge
max at the water
6′ / 8′Fence and hedge
max inland
5′ / 15′Street edge
and visibility zone
Placement Before MaterialWhere a fence sits — waterfront zone, mid-lot, street frontage — shapes the design far more than what the fence is made of
Views Are Part Of The ReviewHeight limits near the water exist to keep the shoreline visually open from the homes and the street behind it
Hedges Count TooPlanting is measured the same way fencing is; a hedge over the allowance is the same issue as an over-height fence
Good Side Faces OutThe finished face turns toward the neighbor or the street, with a documented exception where an obstacle already exists

Section 09

Common waterfront fence planning mistakes.

Six things that send a Sea Ranch Lakes fence plan back for redesign, why each one happens, and what avoids it. None of them are unusual. All of them are cheaper to solve on paper.

01

Ignoring waterfront height restrictions

Why it happens
A six-foot privacy design is carried all the way to the seawall because it works everywhere else on the lot.
How to avoid it
Draw the fifteen-foot band on the survey first, then design the run to step down as it approaches the water.
02

Overlooking street visibility zones

Why it happens
The front of the property is treated as ordinary yard, and the five- and fifteen-foot measurements are never taken.
How to avoid it
Mark both street zones before the fence line is set — and mark them on both frontages of a corner lot.
03

Assuming waterfront rules match other cities

Why it happens
Experience from a previous home, or a contractor's standard detail from another municipality, is applied here unchanged.
How to avoid it
Confirm the village's own measurements for the specific property rather than working from a general South Florida standard.
04

Incorrect fence placement

Why it happens
The line is set off a seawall cap, an old hedge or a neighbor's fence instead of off located survey corners.
How to avoid it
Stake the layout from the recorded survey and measure the waterfront zone from the mean water line.
05

Ignoring waterfront sight lines

Why it happens
The design is judged standing at the water rather than from the terrace, the pool deck or the living room.
How to avoid it
Check the view from seated height at the places the family actually uses before committing to a height.
06

Improper fence orientation

Why it happens
Panels are hung with the framing facing out, or an exception is assumed for an adjacent hedge without approval.
How to avoid it
Note the finished side on the plan, and document any exception during review rather than at installation.
Most issues are discovered during planning rather than construction.

Section 10

Popular fence types in Sea Ranch Lakes.

Once placement and height are settled, material follows the condition. Waterfront runs, pool enclosures, side-yard screening and street frontage each ask for something different, and most waterfront projects use more than one.

01

Vinyl Fencing

Explore
02

Aluminum Fencing

Explore
03

Wood Fencing

Explore
04

Chain Link Fencing

Explore
05

Composite Fencing

Explore
06

Gates & Automation

Explore
07

Commercial Fencing

Explore
More

Not sure which?

Get a free estimate

Section 11

The typical Sea Ranch Lakes project timeline.

Eight steps, in order. The first five are planning, and they are the reason the last three go quietly. Changes, when they happen, happen here — on paper, before anyone digs.

  1. 01 · Site Visit

    We walk the property, look at the water edge, the street frontage and the views from where you actually sit.

  2. 02 · Survey Review

    Boundary, setbacks, seawall, mean water line and easements are read off the signed survey before anything is drawn.

  3. 03 · Waterfront Review

    The fifteen-foot band, the height transition and the sight lines from neighboring lots are laid out on the plan.

  4. 04 · Permit Review

    Nikki files the package — scaled site plan, heights by zone, gate locations, orientation and materials.

  5. 05 · Approval

    Once approved, materials are ordered as one take-off so color, profile and hardware match end to end.

  6. 06 · Installation

    811 locates in hand, our own crews stake the line off the survey and build. Cleaned daily.

  7. 07 · Inspection

    Placement, heights by zone, orientation and gate hardware are verified against the approved plan.

  8. 08 · Completion

    Final walkthrough, gate operation demonstrated, warranty paperwork handed over.

Nikki, Permit Coordinator

Meet your project liaison

Nikki

Permit & Project Coordinator

Nikki runs the back-of-house side of every Sea Ranch Lakes project — preparing site plans, submitting permits, coordinating surveys and waterfront reviews, tracking comments and scheduling inspections. The paperwork is a real part of a waterfront fence project, and it is the part homeowners least want to chase. If you ever wonder where yours stands, she is the person to call.

The most successful waterfront projects begin with planning before material selection.

Sea Ranch Lakes project spotlights

Recent jobs.

Recent Sea Ranch Lakes jobs focused on waterfront-ready materials, gates and cleaner long-term maintenance.

Wood Cypress PVC
01 - Wood Cypress PVC project

Wood Cypress Vinyl Upgrade

Project

A Wood Cypress PVC upgrade selected for waterfront character, privacy and lower maintenance.

Case Study ->
Custom Welded
02 - Custom Welded project

Custom Welded Aluminum Upgrade

Project

A custom welded aluminum upgrade built for a sharper waterfront-ready entry and durable finish.

Case Study ->

Section 12

Sea Ranch Lakes fence questions.

Straight answers to what waterfront homeowners ask before a project starts. Still wondering something? Just call — we are happy to talk it through.

How close can a fence be to the intracoastal?

A fence can generally be built close to the water, but what changes is its height rather than its position. The first fifteen feet inland from the mean water line are held to three feet for both fence and hedge. Shoreline conditions — seawall, dock, slope — are reviewed with the plan, so the exact line is confirmed against your survey.

What is the 15-foot waterfront zone?

It is the band of property measured inland from the mean water line where fence and hedge heights are limited in order to preserve waterfront character and visibility. It applies regardless of material, and it is measured from the water line on the survey rather than from the seawall cap or the edge of the lawn.

How tall can a fence be near the water?

Three feet inside the waterfront zone. Beyond fifteen feet from the water, the allowance steps up to six feet for fence and eight feet for hedge, subject to the street-side zones at the front of the property. Many waterfront runs are drawn as a deliberate transition between the two.

Can I install a privacy fence along the waterfront?

Not at full privacy height within the waterfront zone. What works instead is layering: a low fence at the water for boundary and safety, with screening placed along the sides of the property where the exposure actually comes from. That combination satisfies the height limits and still delivers privacy where it matters.

Why are waterfront fence heights different?

Because the shoreline is read as a continuous edge rather than as a series of separate backyards. Holding fence and hedge low near the water keeps the waterway visible from the homes and the street behind it, and keeps one property's screening from closing off a neighbor's view.

Can I install a fence close to the street?

Not within five feet of the street, and nothing over three feet within fifteen feet. Both distances are measured from the property line, which usually sits well behind the pavement edge. A corner lot carries these measurements on both frontages.

What does "finished side facing out" mean?

The smooth, finished face of the fence turns toward the neighboring property or the street, with posts and rails on your side. There is a recognized exception where a significant obstacle already exists on the adjacent property — an established hedge or an existing fence — in which case an alternate post orientation may be approved during review.

Do I need a permit?

Yes. Residential fence work is permitted, and the submittal is drawn on a signed survey showing placement, heights by zone, gate locations and orientation. Waterfront properties carry an additional review of the shoreline conditions and the fifteen-foot zone. We prepare and file the package as part of the project.

Can waterfront properties have custom gates?

Yes. Gates are planned with the same zone logic as the fence — height follows the zone the gate sits in, and street-side gates are held behind the visibility measurements. Automation, access hardware and finish are specified for coastal exposure, which matters considerably more on the water than inland.

How long does permitting take?

It depends on the review queue and, far more, on whether the submittal is complete. A package filed complete the first time — current survey, scaled site plan, waterfront zone drawn, heights shown by zone, orientation noted — moves considerably faster than one that comes back for corrections.

Have a question we didn't cover?

Ready when you are

Plan your Sea Ranch Lakes
fence project with confidence.

Whether you're balancing privacy and waterfront views, planning around height restrictions, or designing a fence that complements the character of the community, understanding the process early can help avoid costly mistakes and permit delays.

Financing available

Fence now. Pay over time.

Power Fence can help customers explore monthly payment options through Wisetack for eligible fence, gate, and railing projects.

UP TO 25K ELIGIBLE PROJECTS Fast customer prequal No prepayment penalty

Ask about financing

Financing subject to credit approval. Payment options are provided by Wisetack lending partners.