Oakland Park is laced with canals and drainage easements, so where a fence sits matters as much as how tall it is. Start with the basics and work outward to the edges.
On your property - including the footings
The City's Residential Fence Requirements state that all fences and footings must be completely within your property lines. Not just the panels - the concrete too. In the listed R-1A, R-1B and R-1C districts, a fence, wall or hedge may be erected on any plot line and in the required yards, subject to the height and visibility limits above.
Where the front yard starts
For R-1 and R-2 districts, the City identifies the front yard setback as 25 feet from the property line - and on R-1 lots that are 40 feet wide, 35 feet. That setback defines the "front yard" the 3--foot/40%-open rule governs, so knowing it tells you how deep the open-fence zone runs.
Easements - and what may sit in them
An easement is a recorded strip your deed gives someone else the right to use - typically utilities or drainage. Under the annexed-area rules, no permanent structure except a wood or chain-link fence may encroach into an easement of record, and nothing may obstruct an easement granted for ingress or egress. If you do place a fence in any easement, the City's checklist requires a recorded easement agreement. Build it removable, and expect to take it down if the easement holder needs access.
Backing a canal? Plan for the extra reviews
This is the Oakland Park edge case worth budgeting for. A fence bordering a waterway requires Engineering review, and the fence-and-gate checklist requires a Drainage District Approval Letter for that fence. It's a separate sign-off from a separate agency - line it up early so it doesn't stall the permit. And in a regulated floodway, a fence that could block floodwaters - including stockade and wire-mesh fences - has to meet the City's floodway limitations, which usually points you toward an open, water-passing design.
Gates & digging
Two quick ones that trip people up: no gate may open onto the existing road right-of-way - it has to swing in. And before any post hole, Florida law requires Sunshine 811 notice at least two full business days before excavation. It's free and keeps an auger out of a buried line.