Call Us: 954-371-1370 Email: info@powerfenceinc.com 902 SW 2nd Place, Pompano Beach, FL 33069
Licensed & Insured - Broward Lic. 20-F-21831-X
Palm Beach Lic. U-22529
Resources / City Fence Rules / Pembroke Pines
Reviewed Apr 2026 Read 15 min Sections 8
A Homeowner's Handbook - City of Pembroke Pines

A vinyl or metal fence here needs an engineer's stamp.

The two materials most homeowners want - PVC and aluminum - need plans signed and sealed by a Florida architect or engineer in Pembroke Pines, while wood and chain link just follow the building-code method. And the front yard is largely off the table: a fence can't sit in your front-yard setback except on corner lots or in the R-MH district. Add an HOA affidavit you file even with no HOA, a landscape affidavit and a tree permit, and you've got the real picture - here it is in plain English.

6 / 8 ftResidential / adjacent nonresidential
2 ftFront setback & within 25 ft of a corner
PVC & metalSigned & sealed plans required
HOA affidavitRequired even with no HOA
01
Where the fence can go, and how tall

Six feet in the yard - but keep it out of the front setback.

Pembroke Pines keeps height simple and then adds a placement rule that surprises people: the front-yard setback is essentially a no-fence zone. Get both right and the rest of the project follows easily.

The heights

  • 6 feet - a fence, wall or hedge along or adjacent to a lot line on residentially zoned property may not exceed 6 feet in any yard. Height is measured from grade.
  • 8 feet - where the residential lot line is adjacent to a nonresidential use, the limit along that line rises to 8 feet.
  • 36 inches - in the R-MH district, a fence within the front-yard setback can't exceed 3 feet (more on that district in section 02).

The front-setback rule - the big one

Here's the rule that shapes most Pembroke Pines front yards: a fence, wall or hedge must not encroach into the front-yard setback at all - except for the corner-lot and R-MH exceptions in the Land Development Code. In plain terms, your fence generally starts behind the front setback line, not at the sidewalk. That's why so many Pines homes enclose the back and sides and leave the front open.

The 2-foot visibility limits

Two separate visibility rules keep corners and frontages clear. In any residential district, no fence, wall or hedge may exceed 2 feet above the nearest street grade:

  • within the front setback, and
  • within 25 feet of the intersection of any street lines (or those lines extended).

On top of that, the line of sight must not be obstructed, and any ground cover, shrub or hedge in the swale must stay under 2 feet.

FIG. 01 - HEIGHTS, THE FRONT-SETBACK NO-FENCE ZONE & VISIBILITY MAXIMUM HEIGHT - RESIDENTIAL 3' R-MH FRONT 6' ANY YARD 8' ADJ NONRES Height measured from grade. INTERIOR LOT - FRONT SETBACK = NO FENCE STREET SWALE - planting = 2 ft FRONT-YARD SETBACK no fence - nothing over 2 ft setback line FENCE STARTS BEHIND THE SETBACK - = 6 FT HOUSE Plus: = 2 ft within 25 ft of any street intersection (see -02).
Fig. 01 - The front setback is the decision
Tall in back, low and clear out front
  • 6 ft in any residential yard; 8 ft adjacent to a nonres use.
  • No fence in the front-yard setback (corner-lot & R-MH aside).
  • = 2 ft above grade in the front setback & within 25 ft of a corner.
  • Swale planting under 2 ft; keep the line of sight clear.
Plan the fence behind the setback

On a standard interior lot, your fence generally can't sit in the front-yard setback - it starts behind the setback line, and anything in that zone (or within 25 ft of a corner) is capped at 2 feet. Design privacy for the sides and rear at up to 6 feet. The exceptions - corner lots and R-MH - are in the next section.

02
When the front yard is on the table

Two ways a fence is allowed in the front setback.

The front-setback rule has two written exceptions. If one fits your lot, a front-yard fence is possible - but each comes with its own conditions.

Corner lots with a side-street entrance

A fence may be installed in the front-yard setback of a corner residential lot where the primary entrance to the home is on the street-side yard. Because the "front door" faces the side street, the code lets you enclose what would otherwise be a second front yard. This isn't automatic: it's approved by the Planning & Economic Development Department Director (or designee) as part of the building permit. So if you have a corner lot, ask about this exception early - it can change what you're able to enclose.

The R-MH district

In the R-MH district (manufactured-home), a fence may be installed within the front-yard setback, but only under that district's specific standards:

  • Height: no more than 36 inches (3 feet).
  • Material: decorative aluminum or wood - and no more than 50% opaque, so it stays open and airy.
  • No chicken wire or any wire-type fence in the front setback.
  • It must not obstruct sight-distance triangles, or block fire hydrants, water valves, meters or sewer clean-outs, or otherwise prevent City utility maintenance.

Both exceptions exist for the same reason: a front-yard fence is only allowed where it won't close off the streetscape or block sightlines and utilities.

FIG. 02 - THE TWO FRONT-YARD EXCEPTIONS CORNER LOT - ENTRANCE ON SIDE STREET FRONT STREET SIDE STREET FENCE OK HERE (w/ approval) HOUSE ? primary entrance Planning Dir. approval at permit R-MH DISTRICT - FRONT-SETBACK FENCE = 36 IN decorative aluminum or wood - = 50% opaque no chicken wire / wire fence keep hydrants, valves, meters & clean-outs accessible
Fig. 02 - Two doors into the front yard
A corner-lot approval, or the R-MH standards
  • Corner lot, entrance on side street: front-setback fence with Director approval.
  • R-MH: = 36 in, decorative aluminum/wood, = 50% opaque.
  • R-MH: no chicken wire or wire-type fence out front.
  • Keep sight triangles & utilities clear either way.
On a corner lot? Ask first

The corner-lot front-yard fence is a discretionary approval by the Planning & Economic Development Director as part of your permit - not a guarantee. If your home's entrance is on the side street, raise it before you design, so the layout matches what will actually be approved.

03
What you build with - and the stamp it may need

Vinyl and metal need an engineer's seal; wood and chain link don't.

This is the Pembroke Pines rule most likely to change your budget and timeline - and it's tied directly to the material you choose. The code splits fences into two documentation paths.

The signed-and-sealed split

  • PVC or metal fences: the plans or drawings must be signed and sealed by a Florida-licensed architect or engineer. Vinyl and aluminum - the two most popular residential picks - fall here, so budget for engineered drawings.
  • Wood or chain-link fences not designed by an architect or engineer: installation must follow the prescribed method in the Florida Building Code, 7th Edition. No individual seal needed - you build to the published detail.

It's not that vinyl and aluminum are discouraged - they're common here. It just means a complete quote for those materials includes the sealed plans, and a quote that leaves them out isn't really finished.

Finished side faces out

The finished side of the fence must face the abutting property, the adjacent property, or the street when feasible - neighbors and the street get the "good" side. If the finished side genuinely can't face outward, the owner must provide evidence, and the Planning & Economic Development Director (or designee) reviews it as part of the building permit.

Barbed wire - mostly banned

Barbed wire and barbed-wire-topped fences may not be erected or maintained on residentially zoned or residentially used property, except in the R-E or A zoning districts. For a typical single-family lot, that means no barbed wire.

A note on the rest

Beyond the R-MH district rules, the barbed-wire ban, the pool-barrier construction (section 05), and the permit-document requirements, the Land Development Code doesn't publish a general allowed-materials list for standard residential fences. So the practical guide is: vinyl/metal = sealed plans; wood/chain link = the FBC method; finished side out.

FIG. 03 - WHICH DOCUMENTATION DOES YOUR MATERIAL NEED? PVC & METAL ? SIGNED + SEALED - Vinyl / PVC - Aluminum / metal FL P.E. / ARCHITECT SEAL Plans/drawings sealed by a Florida-licensed architect or engineer - build it into the budget. WOOD & CHAIN LINK ? FBC METHOD - Wood - Chain link FBC 7th Ed. Follow the prescribed FBC 7th Edition detail - no individual seal required. PROHIBITED - RESIDENTIAL Barbed wire & barbed-wire-topped fences (except R-E or A districts) - finished side faces out No general allowed-materials list is published beyond these rules.
Fig. 03 - The material decides the paperwork
A seal for vinyl/metal, a detail for wood/chain link
  • PVC & metal: plans signed & sealed by a FL architect/engineer.
  • Wood & chain link: follow the FBC 7th Edition method.
  • Finished side faces out (exception reviewed by Planning).
  • No barbed wire on residential lots (except R-E / A).
Budget the seal

Going with vinyl or aluminum? Pembroke Pines requires the plans to be signed and sealed by a Florida architect or engineer - that documentation is part of the permit, not optional. Wood and chain link skip the seal by following the FBC method. Make sure your quote names which path it's on.

04
Whose land the fence touches

On your property, off the easement - and a drainage release if you're in the SBDD.

Pembroke Pines doesn't set a specific setback distance for a standard residential fence from your side and rear property lines, but it's firm on the boundaries that matter - and the paperwork that comes with crossing utility and drainage strips.

On your property, not the easement or right-of-way

Your fence must sit entirely on your own property and must not encroach into rights-of-way or easements. The Fence Permit Checklist requires a property survey showing setbacks and the fence location, plus a site plan - that's where the City confirms you're inside your lines.

Building near a utility easement

If your work involves a utility easement, the Utility Easement Hold Harmless Agreement puts the responsibility on you: you must contact the utility companies about line locations, you must allow access, and you must bear the cost of moving the fence if an easement holder ever needs in. In short - build anything near an easement to be removable, and call the utilities before you dig.

South Broward Drainage District release

Parts of Pembroke Pines fall within the South Broward Drainage District (SBDD). If your project is in the district, a permit release from SBDD is required in addition to the City permit - a separate sign-off from a separate agency, so confirm it early if you're near a canal, lake or drainage feature.

Before you dig

Florida law requires Sunshine 811 notice at least two full business days before any excavation, and fence-post holes count. It's free and keeps an auger out of a buried line.

FIG. 04 - YOUR LINES, THE EASEMENT & THE DRAINAGE DISTRICT STREET / RIGHT-OF-WAY - NO ENCROACHMENT FENCE ENTIRELY ON YOUR PROPERTY UTILITY EASEMENT - hold-harmless DRAINAGE / CANAL - SBDD release if in the district HOUSE PAPERWORK BY EDGE Hold Harmless Agreement you allow access & pay to move it SBDD permit release if the project is in the district Survey + site plan setbacks & fence location shown Sunshine 811 = 2 business days before any post hole.
Fig. 04 - The edges carry the paperwork
Stay on your land; sign off the strips
  • Fence entirely on your lot; survey shows setbacks & location.
  • Utility easement: Hold Harmless - you allow access & pay to move it.
  • In the SBDD: a drainage-district permit release is required.
  • Sunshine 811 at least two business days before digging.
Near a canal? Check the SBDD

If your lot is in the South Broward Drainage District, you'll need a permit release from SBDD on top of the City permit. And anything near a utility easement comes with the Hold Harmless Agreement - you accept access and the cost of relocation. Line both up before you build.

05
If there's a pool or spa

When the fence is the pool barrier: nonscalable and impenetrable.

When a fence serves as a swimming-pool safety barrier, the pool-barrier standards in Chapter 150 apply on top of the regular fence rules. The theme is simple: the barrier has to be impossible for a small child to climb over or get through.

  • Wooden-type fences used as a pool barrier must be built to be nonscalable and impenetrable - no toe-holds, no gaps to slip through.
  • Walls used as a pool barrier must be nonscalable.
  • Wire fences used as a pool barrier must be a two-inch chain-link or diamond-weave nonscalable type (or an approved equal), with a top rail, in heavy galvanized or rustproof material.

Why it's strict: a pool barrier is a life-safety device, not a privacy feature. The "nonscalable and impenetrable" standard and the wire specs exist to keep a child from getting over, under, or through it when no one is watching. These standards apply alongside the Florida Building Code pool-barrier requirements, which the Building Department reviews at permit.

FIG. 05 - POOL BARRIER - NONSCALABLE & IMPENETRABLE (CH. 150) POOL WOOD - NONSCALABLE & IMPENETRABLE no gaps - no toe-holds WALL - NONSCALABLE smooth, no climbing aids WIRE - 2-IN MESH + TOP RAIL TOP RAIL galvanized / rustproof
Fig. 05 - The pool-barrier baseline
Climb-proof, gap-proof, rust-proof
  • Wood: nonscalable & impenetrable - no gaps or toe-holds.
  • Walls: nonscalable.
  • Wire: 2-in chain-link / diamond weave, top rail, galvanized/rustproof.
  • Applies alongside the FBC pool-barrier requirements.
Confirm the barrier at permit

When your fence doubles as a pool barrier, confirm the exact current requirements with the Building Department - Chapter 150's nonscalable/impenetrable rules apply alongside the Florida Building Code pool-barrier standards, which are reviewed at permit and updated periodically.

06
The package - and Pembroke Pines' extra affidavits

A permit, two plan sets, and the affidavits that trip people up.

A building permit is required to install a fence in Pembroke Pines. The Fence Permit Checklist is the map - and it carries a few affidavits that catch homeowners off guard, including one you file even if you don't have an HOA.

The core submittal

  • 2 sets of plans, a Broward County Uniform Building Permit Application, a site plan, and a property survey showing setbacks and fence location.
  • Construction documents: signed-and-sealed plans for PVC/metal, or the FBC 7th Edition method for wood/chain link (section 03).
  • Plan review: Building and Electrical review, with Engineering and Zoning review when applicable; an Electrical Application when applicable.

The Pembroke Pines affidavit stack

  • HOA Affidavit of Awareness - required as part of the package even when your property is not in an association. (Where there is an HOA, the affidavit also confirms a City permit doesn't exempt you from HOA rules.)
  • Affidavit of Landscape Compliance for Improvements on Residential Lots - required for the fence permit.
  • Tree permit: a separate tree removal or relocation permit is required before removing or relocating a tree - so if a fence line runs through a tree, handle that first.

Notice of Commencement & zoning

A Notice of Commencement must be recorded, submitted and displayed before the first inspection for a non-mechanical project with a job value over $5,000. And the building permit is separate from zoning - confirm setbacks and plat conditions with the Planning & Economic Development Department before construction. If your project is in the SBDD, include the drainage-district release (section 04).

The new HB 803 building-permit exemption

Effective July 1, 2026, Florida's HB 803 requires permitting jurisdictions to exempt single-family owners (or their contractor) from the building permit for work under $7,500, on a written request with documentation of the work's value. It does not apply in a flood-hazard area or to electrical/plumbing/structural/mechanical/gas work, and it only waives the building-permit step - not the zoning, front-setback, easement, drainage, visibility, pool-barrier, HOA-affidavit or landscape requirements. Ask the Building Department how to file and confirm with Planning what else still applies before you start.

Fig. 06 - A typical Pembroke Pines fence permit - from idea to inspection
Start Survey + design Confirm setbacks; keep the fence out of the front setback.
Step 01 Construction docs Sealed plans for PVC/metal, or the FBC method for wood/chain link.
Step 02 Affidavit stack HOA Affidavit (even with no HOA) - landscape affidavit - tree permit if needed.
If applies SBDD / easement Drainage-district release - Utility Easement Hold Harmless. conditional
Step 03 Review & NOC Building & Electrical (Engineering/Zoning if needed); record NOC over $5,000.
Done Build & inspect NOC displayed before first inspection; build to the approved plan.
File the HOA affidavit either way

Pembroke Pines requires the HOA Affidavit of Awareness even if your property isn't in an association - leaving it out stalls the permit. Pair it with the landscape affidavit, and pull a separate tree permit before removing or relocating any tree in the fence line.

07
The rules the City doesn't enforce for you

Your HOA and deed restrictions are a separate yes.

Two layers of authority sit next to the City code, and the City is explicit that it won't police the private one for you.

Private restrictions run independently

HOA covenants, deed restrictions and private community rules operate independently from City fence regulations and may be more restrictive. Crucially, the City states that deed restrictions are not enforced as part of the City permitting process, and the HOA Affidavit of Awareness confirms that issuing a City building permit does not exempt your property from HOA regulations. So a City permit and an HOA approval are genuinely separate - get the association's written sign-off before you submit.

How the City reviews & enforces

The Building Department handles fence-permit intake and building plan review; the Planning & Economic Development Department reviews zoning, the finished-side and corner-lot exceptions, and landscape/tree items. Fence issues otherwise surface through complaint-based code compliance - and one Pembroke Pines specific: the Code Compliance Unit does not investigate anonymous complaints; a complainant must provide their name and address.

Reviewed by the City

What the permit checks

  • Survey & site plan - setbacks and fence location.
  • Construction docs - sealed plans (PVC/metal) or FBC method.
  • Height, the front-setback rule & the 2-ft visibility limits.
  • Finished-side & corner-lot exceptions (Planning Director).
  • Easement hold-harmless & SBDD release where applicable.
Separate from the City

What you still must clear

  • HOA covenants & deed restrictions - not enforced by the City.
  • The HOA affidavit (filed even with no association).
  • Landscape compliance & any tree removal/relocation permit.
  • South Broward Drainage District release in the district.
  • Utility coordination under the Hold Harmless Agreement.
Two different yeses

The City says plainly that it doesn't enforce deed restrictions and that a permit doesn't exempt you from HOA rules. If you're in an association, get its written approval before you submit - it's the cheapest step to do early and the most expensive to skip.

08
Quick reference & FAQ

The whole handbook, on one page.

City of Pembroke Pines residential fence - at a glance

Source: Land Development Code - 155.655 - Chapter 150 (pool barriers) - Fence Permit Checklist - permit affidavits & forms - Building Dept - Planning & Economic Development Dept
Residential height
Fence/wall/hedge along a lot line = 6 ft in any yard; height measured from grade.
Adjacent nonresidential
Up to 8 ft where the residential lot line abuts a nonresidential use.
R-MH front setback
Fence in the front setback = 36 in (3 ft).
Front-setback rule
No fence/wall/hedge may encroach into the front-yard setback - except corner-lot & R-MH exceptions.
Front-setback visibility
= 2 ft above street grade within the front setback.
Intersection visibility
= 2 ft above street grade within 25 ft of any street-line intersection (or lines produced).
Line of sight / swale
Line of sight must stay clear; swale ground cover/shrubs/hedges = 2 ft.
Corner-lot exception
Front-setback fence allowed where the primary entrance is on the side-street yard - Planning Director approval at permit.
R-MH front fence
Decorative aluminum or wood, = 50% opaque; no chicken wire / wire fence; keep utilities & sight clear.
PVC & metal
Plans signed & sealed by a Florida architect or engineer.
Wood & chain link
Follow the FBC 7th Edition prescribed method (no individual seal).
Finished side
Faces the abutting/adjacent property or street when feasible; exception reviewed by Planning.
Barbed wire
Prohibited on residential property except in R-E or A districts.
Placement
Entirely on your property; no encroachment into rights-of-way or easements. No standard setback specified.
Easements
Utility Easement Hold Harmless - you contact utilities, allow access & bear the cost of moving the fence.
Drainage
South Broward Drainage District permit release required if the project is in the district.
Pool barrier
Wood nonscalable & impenetrable; walls nonscalable; wire 2-in chain-link/diamond weave + top rail, galvanized/rustproof.
Permit
Required; 2 sets of plans, Broward Uniform Application, site plan & survey.
Plan review
Building & Electrical; Engineering & Zoning when applicable.
HOA affidavit
HOA Affidavit of Awareness required - even with no HOA.
Landscape & trees
Affidavit of Landscape Compliance; separate tree removal/relocation permit before touching a tree.
Notice of Commencement
Recorded, submitted & displayed before the first inspection when value over $5,000.
Zoning
Separate from the permit - confirm setbacks & plat conditions with Planning & Economic Development.
Code complaints
Anonymous complaints not investigated - name & address required.
Sunshine 811
Notice = 2 full business days before any excavation, including post-hole digging.
HB 803 exemption
Owner work under $7,500 by written request. Not in flood-hazard areas or for electrical/plumbing/structural/mechanical/gas. Doesn't waive zoning, setback, easement, drainage, visibility, pool-barrier, HOA-affidavit or landscape rules.
Reviewed as of
April 2026. Confirm current requirements with Pembroke Pines Building and Planning & Economic Development departments before ordering materials.

Good to know

Frequently asked questions

Can I put a fence in my front yard in Pembroke Pines?

Usually no. A fence, wall or hedge may not encroach into the front-yard setback, and nothing in that zone may exceed 2 feet above street grade. The two exceptions are a corner lot whose primary entrance is on the side street (with Planning Director approval) and the R-MH district. On a standard interior lot, plan to start the fence behind the setback line.

How tall can my fence be?

6 feet along a lot line in any residential yard (measured from grade), and up to 8 feet where your lot line is adjacent to a nonresidential use. In the R-MH district, a front-setback fence is limited to 36 inches.

Why does my vinyl or aluminum fence need engineered plans?

Because Pembroke Pines requires PVC and metal fence plans to be signed and sealed by a Florida-licensed architect or engineer. Wood and chain-link fences skip the seal by following the Florida Building Code 7th Edition method. It's a real budget line for the popular materials - make sure your quote includes it.

I'm on a corner lot - can I fence the second front yard?

Possibly. If your home's primary entrance is on the street-side yard, a fence may be installed in that front-yard setback - but it's a discretionary approval by the Planning & Economic Development Director as part of the permit. Ask before you design so the layout matches what's approvable.

What's the rule at intersections?

In any residential district, no fence, wall or hedge may exceed 2 feet above street grade within 25 feet of where street lines intersect (or those lines produced). The line of sight must stay clear, and swale planting must stay under 2 feet.

Which way does the finished side face?

Out. The finished side must face the abutting property, adjacent property or the street when feasible. If it genuinely can't, you provide evidence and the Planning Director (or designee) reviews the exception at permit.

Do I need the HOA affidavit if I'm not in an HOA?

Yes - the HOA Affidavit of Awareness is required as part of the fence permit package even when the property is not in an association. It's a common reason a permit gets held up. Where you do have an HOA, the affidavit also confirms a City permit doesn't exempt you from HOA rules.

There's a tree in my fence line - what do I do?

You'll need a separate tree removal or relocation permit before removing or relocating the tree, and the fence package also requires an Affidavit of Landscape Compliance. Handle the tree permit first so it doesn't delay the fence.

What if my lot is on a canal or in a drainage district?

If the project is in the South Broward Drainage District, you need a permit release from SBDD in addition to the City permit. And any work near a utility easement comes with the Utility Easement Hold Harmless Agreement - you contact the utilities, allow access, and pay to move the fence if needed.

What does my pool fence need?

When the fence is the pool barrier, it must be nonscalable and impenetrable (wood), or nonscalable (walls). Wire barriers must be two-inch chain-link or diamond-weave nonscalable type with a top rail, in heavy galvanized or rustproof material - alongside the Florida Building Code pool-barrier requirements.

When do I need a Notice of Commencement?

When the job value is over $5,000. It must be recorded, submitted and displayed before the first inspection.

Does the new $7,500 HB 803 exemption let me skip the permit?

It can exempt owner work under $7,500 from the building-permit step with a written request - but it doesn't waive Pembroke Pines' fence rules. The front-setback rule, heights, the 2-ft visibility limits, easements, the SBDD release, the HOA affidavit and landscape/tree requirements all still apply. It doesn't apply at all in a flood-hazard area, or to electrical, plumbing, structural, mechanical or gas work.

Will a neighbor's anonymous complaint get my fence flagged?

Not anonymously. Pembroke Pines' Code Compliance Unit does not investigate anonymous complaints - a complainant must provide their name and address. The surest path to no issues, of course, is a permitted fence built to code.

Have a question we didn't cover?

Project in
Pembroke Pines?

We keep the fence behind your front-yard setback (and pursue the corner-lot exception when it fits), supply the signed-and-sealed plans for vinyl and aluminum, build wood and chain link to the FBC method, handle the HOA and landscape affidavits - yes, even without an HOA - pull the tree permit when a tree's in the way, line up the South Broward Drainage District release and easement hold-harmless, build pool barriers to the nonscalable standard, and pull the permit with a clean survey through to final inspection.

Call 954-371-1370 Licensed & insured - Broward Lic. 20-F-21831-X

Financing available

Fence now. Pay over time.

Power Fence can help customers explore monthly payment options through Wisetack for eligible fence, gate, and railing projects.

UP TO 25K ELIGIBLE PROJECTS Fast customer prequal No prepayment penalty

Ask about financing

Financing subject to credit approval. Payment options are provided by Wisetack lending partners.