Here's the procedural quirk that surprises people: in Pompano Beach a fence usually needs two green lights, in order. The City's permit checklist confirms that installing, replacing or making a major repair to a fence requires a Building Permit - but before that, zoning has to sign off.
Step one: the Zoning Compliance Permit
A Zoning Compliance Application verifies the proposed fence for zoning compliance - use, setbacks, height, lot coverage and site layout. The Zoning Code requires a Zoning Compliance Permit before a Building Permit (and before development) unless an exception applies. The Development Services Director is the zoning code official who administers that review. In practice, this is where the height, the 15-foot right-of-way rule and any waterfront or overlay conditions get checked.
Step two: the Building Permit
With zoning cleared, the Building Department issues the Building Permit under the Florida Building Code and Chapter 152. Your package needs a survey or site plan showing the location, height and type of fence and gates, and - for any material other than standard 6-foot chain link or wood - product approval or engineered details.
Notice of Commencement & inspections
For most projects over $5,000, a recorded Notice of Commencement is required before the first inspection. At the end, the checklist identifies two sign-offs: a BLDG Final Structural inspection and a Z Zoning Final inspection - so zoning is in the loop at both the start and the finish.
HB 803
Effective July 1, 2026, HB 803 can exempt single-family owners from the Building Permit for work under $7,500 on a written request - but not in a flood-hazard area or for electrical/plumbing/structural/mechanical/gas work, and it only waives the building-permit step. It does not remove the zoning, setback, right-of-way, waterfront, easement, visibility, historic or pool requirements. Ask how to file, and confirm whether the Zoning Compliance review still applies.
Fig. 03 - A typical Pompano Beach fence approval - zoning first, then building
Start Survey + design Location, height & type of fence and gates on a survey/site plan.
Step 01 Zoning Compliance Use, setbacks, height, coverage & layout - required before building.
If applies Overlays / waterfront Historic COA - transit-oriented - seawall/MSL - easement agreement. conditional
Step 02 Building Permit FBC review + product approval for non-standard materials; record NOC over $5k.
Done Two finals BLDG Final Structural + Z Zoning Final inspections.