Every fence and wall in Tamarac needs a building permit before it goes up - the code is explicit that no fence may be installed until the design and materials are approved and a permit is issued. The submittal is straightforward, but two Tamarac details trip people up: the easement release and the property-pin inspection.
The submittal
- A completed Building Permit Application.
- A survey marked to show the fence location and lineal footage.
- Engineer signed-and-sealed plans or a product approval (the PVC/metal criteria call for one or the other).
- An easement release if any part of the fence is located within an easement (section 2).
Property pins & a string line - the step people miss
For final inspection, the City requires your property pins to be located and available, with a string line set so the inspector can confirm the fence is actually on your property. If the pins are buried or lost, the inspection stalls - so have a surveyor locate and expose the pins before you call for final.
Pool & spa barriers
If the fence serves as a safety barrier for a pool or spa, every gate must be self-closing and self-latching. Build that into the gate hardware from the start.
HB 803 - the new $7,500 exemption
Effective July 1, 2026, Florida's HB 803 requires permit-issuing cities to exempt a single-family owner (or their contractor) from the building permit for work valued under $7,500, on a written exemption request with documentation of value. The limits: it doesn't apply in a flood-hazard area, or to electrical, plumbing, structural, mechanical or gas work, and it only waives the building-permit step - it does not remove Tamarac's zoning, easement, right-of-way, sight-visibility, pool-barrier or Woodlands requirements. Ask the Building Department how to file and what still applies before relying on it.
Fig. 05 - A Tamarac fence permit - from survey to final
Start Survey + design Locate pins & easements; set heights, material & the 8-ft canal gap.
Step 01 Application + marked survey Fence location & lineal footage; sealed plans or product approval.
If applies Easement release / hearing Release for an easement; zoning hearing for chain link > 72 in. conditional
Step 02 Permit & build Build to plan; call Sunshine 811 before digging post holes.
Done Final inspection Pins located + string line set so the inspector confirms the line.